When completed, this was the largest membrane water filtration plant in the world. BOSS performed the concrete work on over 70% of the structures for this $165,000,000 facility. BOSS’s crew built a total of 21 structures and poured close to 14,000 cubic yards of concrete over a 16 month period of time.

Engineer: 

CH2M Hill
San Marcos, CA