Project consisted of removal of a fish barrier within Preacher Slough allowing natural hydrologic functions and biological processes to be restored to the slough. The road fill was removed and replaced with a 120 foot bridge.
Engineer:
WA State Department of Natural Resources
Olympia, WA





