Project required removal of a failing 5 foot culvert under WSDOT Hwy 105 with an 87 foot long concrete girder bridge. Technical eliminates of the project required construction of a temporary bridge and redirection of highway traffic via unmanned signal operation, rechanneling of stream flow, pile driving, cast in place concrete deck, piers, and guardrail, new roadway surfacing, along with all of the necessary daily traffic control.

Engineer

WSDOT
Chehalis Office